How to Form and Pour a Concrete Curb

To pour a concrete curb by hand, you dig a trench, build wood or bender-board forms staked to your line, lay and compact a 4 to 6 inch gravel base, mix a 3,500 to 4,000 PSI concrete, place it, shape and tool the top, then let it cure. A standard residential curb is about 6 inches wide and sits 6 inches tall above grade, with the footing part going deeper. Plan on the whole thing taking a weekend for a moderate run: a day to lay out and form, a day to pour and finish, then a few days of curing before you strip the forms and put any load on it.

Most homeowners are not running an extruding curb machine, so the step-by-step below covers the hand-formed method, which is how the majority of DIY curbs and mow strips actually get built. After it, this guide covers what public works specifications require of a professional curb installation: the subgrade and base, how the three placement methods differ, joint spacing and depth, the tolerances a finished curb is accepted against, and what a contractor charges. Those are the numbers that tell you whether to do it yourself or hire it out.

What you're building, and how big

A curb is a narrow, upright ribbon of concrete. The common dimensions for a landscape or driveway-edge curb are 6 inches wide at the top and 6 inches of exposed height, though a lighter garden curb or mow strip can run 4 to 5 inches wide. Contractors forming curb and gutter with wood typically set the back board from a 2x12 and the front from a 2x6, spacing them about 6 inches apart, and excavate roughly a foot deep to fit the gravel and concrete (Hunker). The steps below form a standard vertical-faced curb, the most common profile; if you want a sloped, driveable lip or a gutter pan instead, compare the barrier vs mountable curb types first, because the face shape decides how you build the forms.

Depth is where people cut corners and regret it. In a mild climate, a garden curb only needs to sit on 4 to 5 inches of concrete over compacted gravel. If you get real winters, the base should reach below your local frost line or frost heave will crack it and push it out of line. Frost depth swings from about 5 inches in California to 42 to 60 inches in Minnesota, and the rule for anything structural is to dig 4 to 6 inches deeper than the frost line (Family Handyman). A decorative curb is not a house footing, but a deeper, wider footing at the base is cheap insurance in cold ground.

Tools and materials

  • Marking paint and mason's string line
  • Shovel, mattock, and a hand tamper or plate compactor
  • Gravel (3/4-inch crushed) for the base
  • Concrete curb forms: bender board, 1/4-inch plywood ripped into strips, or flexible plastic form material for curves; 2x lumber for straight runs
  • 1x2 or 2x wood stakes, deck screws, and a drill
  • Rebar (#3 or #4) or wire for reinforcement on longer or load-bearing curbs
  • Bagged high-strength concrete or ready-mix
  • Wheelbarrow or mixing tub, a margin trowel, an edger, a float, and a broom
  • Curing plastic or a spray bottle

Step by step: how to form and pour the curb

Follow these in order. The forming steps matter as much as the pour.

  1. Lay out the line. Mark the curb path with spray paint, then set a mason's string line for straight runs and to guide smooth curves. Contractors treat layout and ground prep as most of the job, so take your time here (Curb Depot). Mark both edges so you know your trench width.
  2. Dig the trench. Excavate along your line to the depth your climate needs, 4 to 5 inches for a mild-climate garden curb, deeper and below frost for a driveway or cold-climate curb. Keep the trench a couple inches wider than the finished curb so the forms have room.
  3. Build and set the forms. For straight sections, screw 2x lumber to stakes driven every 2 to 3 feet. For curves, bender board or 1/4-inch plywood strips flex to the shape; back them with stakes and a bit of packed dirt. Set both faces to your finished width (about 6 inches) and to the height you want the curb to stand, then coat the inside faces with form oil or cooking oil so the concrete releases cleanly. Check the tops with a level, since the form tops are your screed guide.
  4. Add and compact the base. Lay 4 to 6 inches of 3/4-inch crushed gravel in the trench and compact it hard with a hand tamper or plate compactor. A solid, level base is what keeps the curb from settling and cracking later (Hunker).
  5. Set reinforcement (optional but smart). For a short garden curb, fiber-reinforced mix is usually enough. For a driveway curb, a long run, or anywhere it takes wheel loads, run one or two lengths of #3 or #4 rebar along the curb, held up on small chairs so the steel sits in the middle of the concrete, not on the gravel. Wire is a lighter alternative for crack control.
  6. Mix the concrete. Use a curbing concrete mix in the 3,500 to 4,000 PSI range and keep it thick but workable, not soupy (Curb Depot). A low slump holds its shape on the narrow curb top. If you are hand-mixing bagged concrete, do small batches to about the consistency of stiff cake batter, so you can pour before it stiffens (Woodshop Diaries). A 200-foot curb runs roughly $340 to $500 in bagged material.
  7. Place and consolidate. Shovel the mix into the forms and work it with the shovel or a piece of rebar to knock out air pockets, especially against the form faces. Fill to slightly above the form tops.
  8. Screed the top. Drag a straight board across the form tops to strike off the excess and bring the top flush. Fill any low spots and screed again.
  9. Float and edge. Once the surface water sheen is gone and the concrete has firmed up, float the top smooth, then run an edger along both top corners to round them. Rounded edges shed water and resist chipping.
  10. Tool in control joints. Cut or tool a control joint every 8 to 10 feet so the curb cracks where you want it to, not randomly (Curb Depot). On decorative curbs, a shallow trowel cut about 1/4 inch deep does the same job (Woodshop Diaries).
  11. Finish the face and top. For grip, drag a broom lightly across the top. For a cleaner look, tool it smooth with the float. Touch up the face after you strip the forms.
  12. Cure it. Keep the concrete damp for the first several days. Cover it with plastic or mist it, since curbing benefits from a moist cure of up to 7 days for full strength (Curb Depot).

When to strip the forms and use the curb

Do not rush the forms off. Most DIY curbs are left to cure about 3 to 4 days before the forms come off, so the green concrete does not slump or spall at the edges (Woodshop Diaries). After stripping, patch any small voids on the face with a slurry and keep curing. For the strength-by-day figures behind those waiting times, see how long concrete takes to cure.

Concrete reaches roughly 70 percent of its strength in the first week and keeps gaining for about 28 days. A garden curb can take foot traffic and light landscaping within a few days. A curb that takes vehicle tires, like a driveway edge, should wait the full month before you drive on or against it.

Formula for how much concrete you need

Curb volume is cross-section times length. Multiply width by height for the square-foot cross-section, multiply by the length in feet, then divide by 27 to convert cubic feet to cubic yards. For a 6-inch wide by 8-inch tall curb (0.5 ft by 0.67 ft) running 40 feet, that is 0.5 x 0.67 x 40, or about 13.4 cubic feet, roughly 0.5 cubic yards. Add about 10 percent for the base footing and spillage.

Rather than run the math by hand, drop your dimensions into the concrete curb calculator and it will give you the exact yardage and bag count. If you are mixing this with other pours, the how much concrete do I need guide covers the full method.

What a specification requires under the curb

Curb installations fail from underneath. Here is what public works specifications actually require of the ground, because almost none of it appears in DIY guides and two of the requirements are the opposite of what people assume.

Compaction: 95 percent, and by the easier test

Four independent agencies land on the same number. The City of Federal Way's amendment to the WSDOT specification reads "The sub-base for curb and gutter sections shall be compacted to 95 percent density at or below optimum moisture content... before placing the curb and gutter." Gardner, Kansas requires compaction "to ninety-five (95) percent of the maximum dry density as determined by ASTM D698," Hailey, Idaho uses the identical wording, and Michigan DOT's construction manual inspection checklist for curb says "Compacted to 95 percent of Maximum Unit Weight."

Note which test is named: ASTM D698, the standard Proctor, not D1557 modified Proctor. That is the easier of the two targets, which matters if you are hiring a tester or hand-tamping in lifts.

The subgrade has to be wet when you place

This is the strongest cross-check in the whole specification literature on curb, six independent agencies, and it is the step a hand-formed curb nearly always skips. A dry subgrade drinks water out of the bottom of your mix, and the bottom of the curb never gains the strength the top does.

  • Iowa SUDAS section 7010: the subgrade at time of placing concrete "must be in a uniformly moist but not muddy condition to a depth of not less than 1 inch."
  • UFGS 32 16 19, the Department of Defense guide specification: "The subgrade must be in a moist condition when concrete is placed."
  • Caltrans construction manual section 4-7302, as an inspection item: "The subgrade is wet immediately before placing concrete."
  • Iowa DOT section 2512: "Thoroughly moisten the subgrade or cover it with a layer of plastic film."
  • City of San Marcos, Texas: "The base shall be sprinkled lightly with water before p.c. concrete is deposited thereon."
  • Ohio DOT item 609: "sprinkle the subgrade with water until thoroughly moistened."

Moist, not muddy, and not standing water. Iowa's one-inch depth is the only published number for how deep the dampness should go.

Does a curb even need a gravel base? Agencies disagree

Worth saying plainly, because the gravel base is treated as gospel in DIY content and two of the most authoritative specifications do not require one at all. UFGS 32 16 19 asks only that the subgrade be built "to the specified grade and cross section prior to concrete placement" and checked with a full-width template; it specifies no aggregate base under curb and gutter. MnDOT 2531 says "Excavate, shape, and compact the foundation to a firm, uniform bearing surface," and stops there. Iowa DOT wants the subgrade "tamped or rolled until smooth and firm."

Others require one, with a thickness. San Marcos calls for "A minimum of 4 inches (100 mm) of flexible base," Paulding County, Georgia defaults to a "six-inch thick aggregate base under curbs, sidewalks, and gutters," and Ohio DOT makes it conditional on drainage: where drainage is poor, "place a minimum 3-inch (75 mm) thick firm bed of porous material as a foundation." Wisconsin DOT leaves it to the drawings entirely: "Place aggregate base under curb, gutter, or curb & gutter, at the locations, thickness, and section the plans show."

So the honest answer is 3 to 6 inches where a base is required, and no base at all where the subgrade is competent and drains. The 4 to 6 inches in this guide's lede sits in that range and is a safe default for a residential job, but it is a default rather than a rule. If your subgrade is clay that holds water, the base is doing drainage work and you want it.

What specifications forbid outright

Four agencies, one message. Georgia DOT: "Do not place concrete on a muddy or frozen surface." Lynchburg, Virginia: "No concrete is to be placed on a frozen subgrade." Paulding County requires that aggregate base "shall not have snow, ice, frost, or standing water on its surface at the time of concrete placing," and that an inspector "Verify that subgrade is smooth, properly compacted, and free of frost and excessive moisture." Where the soil itself is unsuitable, the Maricopa Association of Governments standard removes it "to a depth of not less than 6 inches below subgrade elevation."

If you want a real check on your trench bottom rather than a judgment call, Gardner, Kansas specifies proof rolling "with a loaded tandem dump truck carrying a minimum load of sixteen (16) tons" before finish subgrade is accepted. The criterion to watch for comes from ACI's Concrete Q&A on proof-rolling: "Take corrective action if rutting or pumping is greater than 1/2 in." On a residential run you are not driving a truck down your trench, but the half-inch rule is a fair test with whatever you do have.

Hand-formed, slipform, or extruded: how installation methods differ

Every specification we read leaves the method to the contractor, subject to approval and a results standard. Maricopa's wording is typical: curbs "shall be constructed by the conventional use of forms, or may be constructed by means of an appropriate machine when approved by the Engineer," and the machine result "must be equal to or better than that produced by the use of forms." Georgia DOT is blunter: "Place the curb and gutter using a machine as long as the results are satisfactory." We found no specification that forbids any of the three methods.

The mix is not the same mix

This is the cleanest difference between hand and machine work and the one that trips people up when they borrow a mix design from the wrong place. A machine holds the shape for you until the concrete leaves the mold, so the mix has to stand up on its own the instant it does. Three independent specifications say the same thing with numbers:

Specified concrete slump for curb, by placement method
SpecificationHand formedMachine or slipform
UFGS 32 16 193 in plus or minus 1 in1 in plus or minus 1/2 in
Iowa SUDAS 70101/2 in to 4 in1/2 in to 2.5 in
Paulding County, GANot stated2.5 in maximum
Michigan DOT section 802Not stated3 in absolute maximum
Iowa DOT 25123 in or less, any method3 in or less, any method

UFGS puts it in one sentence: "Use concrete with a slump of 75 mm [3 inches] plus or minus 25 mm [1 inch] for hand placed concrete or 25 mm [1 inch] plus or minus 10 mm [1/2 inch] for slipformed concrete." Michigan DOT's manual adds the practical consequence: "it is almost impossible to slipform with concrete exceeding the 3 inch (75 mm) slump limit."

Ohio DOT states the same requirement without a number, which is the version to keep in your head while you are mixing by hand: "Use concrete of a consistency that provides the desired shape and remains as placed without slumping of the vertical faces." And a stiff mix will not consolidate itself. Wisconsin DOT requires mechanical vibration "for concrete with slump less than 2 inches," so if you mix to a machine slump and rod it by hand you will leave voids in the face. For a hand-formed curb, mix at the wetter end of the hand-formed range, not the machine range. The concrete mix calculator covers proportions, and what psi concrete you need covers where strength stops buying anything.

What each method actually produces in a day

Arizona DOT publishes a production rate table that states the hand-versus-machine attribution explicitly. Its "Curb & Gutter" item runs 300 to 1,500 linear feet per day, noted as "Lower end of range accounts for manual form work whereas higher end of range is handled via slip form." Its extruded-type item runs 200 to 400 feet a day, rising to 800 to 1,200 "In situations where curb is a long continuous run." Michigan DOT's table gives curb a low of 800, an average of 1,300 and a high of 2,000 feet per day, and Power Curbers, the machine manufacturer, uses "2,000 linear feet per day which is a good average."

That roughly fivefold gap between hand and machine is the whole economics of this decision, and it is why a short run stays hand-formed even for a contractor. Iowa SUDAS writes the crossover into its specification: "Use a paving machine for curb and gutter. For curb and gutter sections less than 250 feet, hand finish methods may be used." Read that carefully. It is a permission threshold, not a published economic minimum, and we could not find a manufacturer or contractor who states a minimum job length in feet. What manufacturers publish instead is an annual volume: Power Curbers reckons 20,000 to 25,000 linear feet a year justifies buying a machine. For a driveway apron or a mow strip, renting a machine is not the answer. The curbing machine guide goes into rental, purchase and operation if you want the numbers.

Joints, which is the part DIY guides get wrong

A curb with no joints cracks where it wants to. A curb with joints cracks where you put them. The published spacings disagree with each other, and the disagreement is more useful than any single number.

Contraction joints: 10 feet is the default, with real outliers

Seven agencies specify 10 feet or a maximum of 10 feet for curb and curb and gutter: Maricopa ("shall not exceed ten feet"), Memphis ("Dummy joints shall be installed at 10 feet on center"), Hailey Idaho, Minot North Dakota, San Marcos, Paulding County and Ohio DOT ("1/4-inch (6 mm) wide contraction joints at 10-foot (3 m) intervals"). Three go wider or narrower: UFGS specifies 5 to 15 feet, Wisconsin DOT 6 feet to approximately 20 feet, and Georgia DOT no more than 20 feet.

Notice that UFGS and Wisconsin both set a minimum as well as a maximum. Joints crowded closer than about 5 or 6 feet are a defect in their own right, which is counterintuitive if you have been told more joints means fewer cracks. For a residential curb, 10 feet is the safe default and matching the joints in any adjacent concrete is better still, which is what MnDOT requires next to concrete pavement.

Expansion joints: the specs disagree by more than tenfold

Here the numbers scatter so widely that quoting one would be misleading. Paulding County says 30 feet. UFGS says 30 to 120 feet where the curb does not abut concrete pavement. Memphis and San Marcos say no more than 40 feet with a 3/4 inch filler. Maricopa says "The maximum distance between expansion joints shall be 50 feet." Minot says every 100 feet "and as close to lot lines as possible." Wisconsin DOT allows 6 feet to 300 feet on tangent sections. Michigan DOT puts independent curb at roughly 400 feet or at street returns, whichever comes first.

What is consistent is where they go, independent of spacing, and this is the part that matters on a driveway or a garden curb:

  • At radius points. Maricopa: "at all radius points, at both sides of each driveway, at both sides of each alley entrance." MnDOT places filled expansion joints "at the ends of curved sections." Wisconsin DOT: "Locate joints everywhere that tangent and radial curb, or curb & gutter meet."
  • At structures and inlets. Wisconsin DOT gives the only published offset we found: "on each side of every inlet 3 feet from the inlet, but no closer than 6 feet from another joint."
  • Against existing concrete. Anywhere your new curb meets a slab, an apron or an older pour, that interface is an expansion joint, not a cold joint you butter with slurry.

How deep, and when to saw

Specified joint depth runs from one fifth to one quarter of the section, or 3/4 inch to 2 inches absolute. Georgia DOT is the most precise: "Form joints at least one-fifth but not greater than one-fourth the depth of the concrete." Ohio DOT wants "one-fifth or more of the curb height." Lynchburg requires "at least 1/4 of the depth... approximately 1/8 inch in width." Wisconsin DOT sets an absolute floor of 2 inches, as does Hailey Idaho, which also pins the width at 1/8 to 3/16 inch. San Marcos and Fairfax accept 3/4 inch.

If you are sawing rather than tooling, Minot puts a clock on it: "Sawed joints shall be sawed within 24 hours after pouring." Too early and you ravel the edge, too late and the curb has already cracked where it wanted to.

One correction worth making, because it appears in a lot of DIY advice: do not dowel across a curb's own contraction joints. Every tie bar provision we found ties the curb to the adjacent pavement, not across the curb's joints. Ohio DOT is the most specific: "install No. 5 (No. 16M) tie bars vertically in the pavement at 1-foot (0.3 m) intervals and in a line 3 inches (75 mm) inside of and parallel to the pavement edge." Michigan DOT says the steel "will need to be gapped on each side of each expansion and contraction joint, but continued through any plane-of-weakness joints." A joint you have doweled through is not a joint. If you are counting steel for a job, the rebar calculator handles bars and laps.

How a professional installation gets accepted or rejected

These are the numbers that decide whether an agency pays for a curb, and they are a useful yardstick for your own work because they tell you what good looks like in measurable terms.

The straightedge test

Ten agencies publish a tolerance, almost all of them against a 10 foot straightedge, and they cluster tightly:

Published acceptance tolerance for finished curb, over a 10 foot straightedge
Tolerance in 10 ftAgencies
1/8 inIowa SUDAS, Iowa DOT, and the WSDOT-based Federal Way standard, which also allows 1/4 in on alignment
3/16 inMichigan DOT, which requires correction "before the concrete sets"
1/4 inMaricopa, Georgia DOT, UFGS, and Ohio DOT for slipform work
3/8 inMnDOT, which calls deviations of 3/8 in or more in any 10 ft "unacceptable Work", and the Virginia municipal template

A quarter inch in ten feet is the middle of the published range and a fair target for hand work. Section thickness is held tighter still: Ohio DOT's slipform clause says the curb "shall not vary by more than 1/4 inch (6.4 mm) from the proposed typical section," and UFGS removes and replaces anything "deficient in thickness by more than 6 mm [1/4 inch]." Caltrans allows dimensions to fall short of the minimum "by 1/4 inch for acceptance" and slopes to exceed the maximum "by 0.2 percent."

The test that actually matters on a curb you built

Maricopa publishes a functional acceptance criterion that no DIY guide mentions and that catches the failure a hand-formed gutter most often produces: the gutter is deficient if water ponds "to a depth greater than 1/2 inch." A straightedge will not find that. A hose will. Run water down the finished gutter before you backfill, and if it stands half an inch deep anywhere, the grade is wrong while you can still do something about it. The concrete slope calculator works out the fall you need over a given run.

Curing, and the application rate people get wrong

If you are using a curing compound rather than plastic, the published rates vary by more than twice and under-application is a real failure. MnDOT and Maricopa both call for 1 gallon per 150 square feet, Maricopa in two coats. The Virginia template allows 100 to 150 square feet per gallon and forbids going thinner than 350. UFGS specifies about 200 square feet per gallon for both coats combined. Michigan DOT uses 1 gallon per 25 square yards, which is 225 square feet. MnDOT and Minot both require application "within 30 minutes" of placement, or once the bleed water has gone.

Duration is more consistent. UFGS requires protection "for at least 7 days from the beginning of the curing operation," and where burlap mats are used they must be kept "continuously in a saturated condition... for not less than 7 days." Forms come off earlier: San Marcos keeps them in place "a minimum of 24 hours."

Cold weather has a hard line at 40 degrees. UFGS: "Do not place concrete when the air temperature reaches 5 degrees C [40 degrees F] and is falling," then maintain the concrete at 50 degrees "for not less than 72 hours after placing." Paulding County stops placing below 39 degrees. Minot requires a written request to the engineer below 35. Hot weather is thinly specified for curb; the one hard number is UFGS capping the concrete as placed at 85 degrees "except where an approved retarder is used." Our set, cure and dry time guide covers the general case.

Backfill and traffic: the two waits

Three independent agencies put backfill at 72 hours. MnDOT gives both the floor and the condition: "Protect newly placed concrete from damage by adjacent vibratory or backfilling operations for a minimum of 24 hours," and perform backfilling "at least 72 hours after placing the concrete or after the concrete reaches a compressive strength of at least 2,000 psi." Minot requires "at least 72 hours of cure time before the curb is backfilled," and San Marcos specifies "a minimum of 3 days curing" before backfill. Lynchburg sets a deadline rather than a wait, requiring backfill "within 3 to 7 days from pour," which is a point most guides miss: an unbackfilled curb is unsupported at the back and can be knocked over.

Excavate wide enough to do it. San Marcos prepares subgrade "including a minimum of 12 inches (300 mm) behind the curb."

On opening to traffic the specifications genuinely split. Paulding County, Georgia requires curing "not less than three days prior to opening to vehicle traffic," and six days in cold weather. The Virginia template excludes vehicles "for the first 7 days." Three days against seven, from two independent specification families, which is a better answer than any blog's flat seven and tells you the honest range.

What professional curb installation costs

Two state DOTs land within about ten percent of each other on awarded work. Florida DOT's statewide historical item averages for the six months to January 2024 put concrete curb and gutter Type F at $50.13 per linear foot across 89,112 feet and Type E at $49.14 across 34,543 feet, with concrete curb Type A at $51.26 and Type D at $38.79. Louisiana DOTD's average for concrete curb is $45.00 per linear foot. Those are the two highest-confidence figures available because the quantities are large.

They are also highway prices, carrying traffic control, bonding, survey, testing and often prevailing wage, so read them as a ceiling. Contractor-reported residential figures run far lower and vary by metro: roughly $9 to $14 a foot in South Carolina, $10 to $12 in Utah, $12 to $15 in North Carolina and $14 to $22 in Dallas depending on whether a gutter is included. Those are self-reported and dated, so treat them as a range rather than a quote. The most defensible residential-side number is a government one: the City of Columbus will reimburse a property owner "up to $110.00 per lineal foot of approved curbing," paid at the lowest of three required contractor estimates. That is a cap calibrated on real residential bids, not an average.

The spread between $9 and $110 a foot is not a measurement problem. It is quantity, traffic control and who carries the risk. The concrete curb cost guide breaks the whole picture down, and curb repair has the bid data on removal and replacement, including a municipal contract where five contractors priced eight linear feet of curb removal between $5.50 and $130 a foot.

If you are weighing hiring against doing it yourself, the honest comparison is not material cost. It is that a crew does 300 feet a day hand-formed and your weekend does rather less, and that the agency tolerances above are what they are being paid to hit. For a mow strip or a garden edge, DIY wins easily. For a run of street-facing curb and gutter with a drainage obligation, the ponding test is the one you do not want to fail after the concrete sets.

If the curb has a gutter pan

Everything above is for a curb on its own, formed by hand. A curb poured with a gutter pan in the public right of way is a different job: the section is placed monolithically, the pan is sloped to a flow line that the drainage design depends on, the joint layout is set by a local standard rather than by you, and long runs are extruded by machine from a mix at about a 1 inch slump rather than hand placed at 3. Concrete curb and gutter covers all of that, and the curb and gutter calculator handles the two-part cross-section.

Frequently asked questions

What is the best concrete mix for a curb?

A high-strength mix in the 3,500 to 4,000 PSI range, kept at a low slump so it holds its shape on the narrow form. Bagged high-strength concrete works fine for small runs; order ready-mix if you are pouring more than about a cubic yard.

How deep should a concrete curb be?

In a mild climate, 4 to 5 inches of concrete over a compacted gravel base is enough for a garden curb. Where the ground freezes, the base of the curb should reach below the local frost line to prevent heaving, which can mean digging 12 inches or much deeper depending on your region.

Do you need rebar in a concrete curb?

Not for a short decorative curb, where fiber mix or wire handles cracking. For a driveway curb, a long run, or anywhere it takes wheel loads, run one or two lengths of #3 or #4 rebar down the middle of the curb.

How wide is a standard concrete curb?

Most residential and landscape curbs are about 6 inches wide, with garden curbs and mow strips sometimes as narrow as 4 to 5 inches. Street curb and gutter is wider because it includes the gutter pan.

When can you remove concrete curb forms?

Wait about 3 to 4 days so the concrete is firm enough not to slump or chip at the edges. Keep curing after you strip the forms, and wait the full 28 days before driving on or against a curb that takes vehicle loads.

Should I hand-form the curb or rent a machine?

For a short run, hand-forming is cheaper and gives you full control. For hundreds of feet of continuous decorative curb, a curbing machine is faster. See the cost guide to compare, and the curb and gutter guide if you are pouring a combined section. More silo guides live on the concrete curb hub.