How to Cure Concrete

To cure concrete, keep it moist for 7 days: water it so the surface never dries, cover it with plastic sheeting at least 4 mils thick, or spray a curing compound at about 150 to 200 square feet per gallon. Start as soon as the surface can take it, and don't hose it now and then and let it dry in between.

Why curing matters more than it looks

Concrete that dries early stops gaining strength, and the surface, which dries first, ends up weakest. The goal, per NRMCA's CIP 11, is to "prevent loss of moisture and maintain a favorable temperature to support continued hydration."

  • Strength

    Half the strength

    Air-dried concrete "will gain only 50% of the strength of continuously moist-cured concrete" (Penn State). More in what happens if you skip curing.

  • Surface

    Crazing, dusting, scaling

    "Proper curing reduces the potential for crazing, dusting, and scaling" (NRMCA CIP 11).

When to start and how long to keep going

Keep it moist 7 days in normal weather: ACI 308.1 sets 7 days as the default above 10°C (50°F), and CIP 11 says "at least 3 to 7 days."

Timeline of curing days 0 to 7: start when the bleed-water sheen is gone; 3 days for high early strength Type III cement; 7 days in normal weather under ACI 308.1 above 50 F; in cold weather use plastic and blankets instead of water.
  1. Start as soon as the surface can take it. After the sheen goes for a compound (FHWA, citing ACI 301), or once water won't mark it.
  2. Pick one method. Water, plastic or a curing compound, from the sections below.
  3. Never let it dry between waterings. And don't use water much colder than the slab.
  4. Keep going for 7 days. 3 for Type III cement (Arizona DOT); in cold weather see pouring concrete in cold weather.

Water curing: how often to water new concrete

Often enough that the surface never dries between waterings; there's no set number of times a day. NRMCA's CIP 11: "Alternate wetting and drying is not an acceptable curing practice," and its CIP 3 says it "will increase the potential for craze cracking."

Schematic of surface moisture over a day: a slab kept continuously damp never reaches dry, while one hosed now and then dries out between waterings, which NRMCA calls not an acceptable curing practice and which increases craze cracking.
  • Sprinkler or soaker

    Short, frequent

    Sprinklers for flat work, soaker hoses for vertical, per Penn State's curing notes.

  • Wet burlap

    Keep it wet

    Rewet before it dries, or it wicks water back out. ACI lists it with ponding and sprinkling.

  • Soak and cover

    Best unattended

    Wet the slab, then lay plastic; it holds the water between visits.

Watch the water temperature. Penn State says no more than 20°F cooler than the surface, and ACI 308.1 (via FHWA) 10°C (18°F); a cold soak on warm concrete can crack it. And don't blast a fresh surface: water "could also erode the concrete surface."

Plastic sheeting

Use ASTM C171 sheeting at least 4 mils thick (CIP 11), weight or tape the edges, lay it once the surface won't mark, and leave it the full curing period.

  • Good for

    Unattended slabs

    No watering, so nobody has to be home.

  • Avoid on

    Colored work

    Wrinkles "will cause dark streaks or a mottled appearance" (CIP 11); NRMCA's CIP 23 says a compound "may be a better alternative."

Curing compound

A curing compound is a liquid membrane to ASTM C309: "Type 1 is clear or translucent (Type 1-D may contain a fugitive dye). Type 2 is white pigmented," per FHWA. White reflects sun and suits hot weather, one of the calls you make when choosing a curing compound.

  • When

    Sheen gone

    After bleed water and finishing; earlier seals water into a bleeding surface.

  • How much

    150 to 200 sq ft/gal

    FHWA (ACI 308): about 160 to 200; W.R. Meadows' 1100-Clear: about 200; Arizona DOT: at least 1 gal per 150 sq ft on driveways.

  • Coatings later

    Wait or remove

    Not until it "has dissipated and/or has been properly removed" (W.R. Meadows).

  • Don't apply

    Rain or cold due

    Not if rain, heavy dew or below 50°F is expected within 24 hours (Quikrete).

Cure and seal is a different standard. ASTM C1315 products stay on as a sealer; Sika's Sikagard-1315 KNS cures at 200 to 400 sq ft per gallon and seals with a second coat. Compare them in cure and seal, or see sealing concrete floors.

Which curing method to use

Plastic for unattended slabs, a curing compound for driveways, decorative work and hot weather, water when someone can keep it wet.

All five methods side by side
Concrete curing methods compared
MethodBest forWatch out for
Sprinkler or soaker hoseSlabs when someone is aroundDrying between cycles, cold water
Wet burlapSmall slabs, steps, edgesBurlap drying and wicking water back
Plastic sheetingMost DIY slabs, unattendedMottling on colored work, wind
Curing compoundDriveways, walks, decorative, hot weatherThin coverage, later coatings
Forms left onEdges, walls, footingsOnly protects formed faces

Forms help too: "Leaving metal or well-oiled wood forms in place may offer considerable protection against the loss of moisture" (ACI). When to remove concrete forms has the minimum times.

Curing in hot and cold weather

In heat, stop evaporation from the first hour; in cold, swap water for insulation.

  • Hot

    3 days min

    NRMCA's CIP 12: wet burlap and plastic, at least 3 days; or a white compound.

  • Cold

    No water

    CIP 11: use moisture-retaining methods, not wet curing, when freezing is expected, so plastic under insulated blankets (cold weather concrete).

Walk, drive and build times are in how long concrete takes to cure, with Quikrete's in Quikrete set and cure time, and the pour itself in how to pour a concrete slab.

Frequently asked questions

How often should you water new concrete?

Often enough that the surface never dries out between waterings. NRMCA says alternate wetting and drying is not an acceptable curing practice and increases craze cracking. A sprinkler on a short, frequent timer, wet burlap kept wet, or soaking the slab and covering it with plastic all work.

How long should you cure concrete?

Seven days in normal weather is the ACI default above 50 degrees F, and NRMCA gives 3 to 7 days. High early strength concrete with Type III cement needs about 3.

Is it better to water concrete or cover it with plastic?

Both work if done properly. Continuous water is the most effective, but only if the surface never dries. Plastic is easier to get right unattended, though wrinkles can leave dark streaks on colored or decorative concrete, where a curing compound is the better choice.

When should you apply curing compound?

Once the sheen of bleed water has disappeared and finishing is complete, at about 150 to 200 square feet per gallon in an even coat. Do not apply it if rain or temperatures below 50 degrees F are expected within 24 hours.

Can you paint or tile over curing compound?

Check first. Manufacturers say not to apply flooring or coatings until the compound has dissipated or been removed, because the membrane can stop adhesives and coatings from bonding.